After a bit of a break (due in combination to a move and 100+ degree weather that made it impossible to work outside for longer than 3 seconds...) we have completed the interior plumbing and the wiring, have started work on the insulation, and soon will begin work on the new aluminum skin! It's very exciting, and here are some shots to give you an idea of how things are looking now.


Additionally, here is a glimpse of the remodeled interior: rather than re-create the old fold down table and picnic style benches, we worked a U-shaped dining area with a platform table in the middle. The PVC pipes adjust to allow for the table to be lowered to the level of the surrounding benches, creating a large sleep space.